Phone: 1-877-377-1122
Frontier Project Solutions
  • Link to LinkedIn
  • Link to Mail
  • Home
  • Frontier Advantages
  • Our Company
    • Our Team
  • Geothermal
  • Oil and gas
  • Well Abandonment
  • Integrated Area Closure
  • News
    • Careers
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu

Tag Archive for: PTAC

News

International Cooperation to Reduce Methane Emissions for Inactive & Leaky Wells

A ground-breaking collaboration between Innotech Alberta, PTAC, Frontier Project Solutions, and Net Zero Technology Centre (NZTC) demonstrates that the energy sector is working domestically and internationally to address the challenges of climate change with new projects and processes to reduce a backlog of inactive wells, and to eliminate methane emissions from leaky wells.

Currently, the sector uses cement to construct or seal wells. This cement can sometimes crack, allowing methane from oil and gas reservoirs to surface. Leaking wells are often challenging to remediate, and when cement fails, multiple attempts may be required to close the well, increasing the financial liability.

An international project will begin momentarily to test five alternatives to cement designed to significantly reduce the risk associated with methane migration to the surface from inactive and leaky wells. Over the next two years, the collaboration will work with half a dozen production companies to test the different products. Once completed, the results of the tests will be shared broadly to educate producers and stakeholders about the benefits of these alternative products. Additional learnings will be disseminated during the testing phase to help companies reduce their environmental footprint.

Click here to learn more: https://www.ptac.org/international-cooperation-to-reduce-methane-emissions-for-inactive-leaky-wells/

November 17, 2022/by Administration
https://frontierps.ca/wp-content/uploads/2020/10/banner-world2.jpg 684 1500 Administration https://frontierps.ca/wp-content/uploads/2017/08/frontierprojectsolutions_logo_horizontal.png Administration2022-11-17 10:59:362022-11-17 11:02:51International Cooperation to Reduce Methane Emissions for Inactive & Leaky Wells

Office

Address:

The Altius Building
Suite 2115, 500 – 4 Ave. SW
Calgary, T2P 2V6

Contact

Eric Diggins, P.Eng.
Cell: 403-470-8164

Kent Devlin, P.Eng., MBA
Cell: 403-464-6091

Dave Brown, P.Eng.
Cell: 403-650-4364

Eric Diggins, P.Eng.
Director – Integrated Projects
Cell: 403-470-8164
EMAIL

  • EMAIL US

Kent Devlin, P.Eng., MBA
Director – Asset Integrity
Cell: 403-464-6091
EMAIL

Dave Brown, P.Eng.
Director – Subsurface
Cell: 403-650-4364
EMAIL

© Copyright - Frontier Project Solutions
  • Link to LinkedIn
  • Link to Mail
Scroll to top Scroll to top Scroll to top